For sale of house in Cabranes, Camás

House for sale

Cabranes, Camás map

135.000 € reduced 5.000 €(taxes and fees not included)
170 m2
4
1
2
south
Description

House , with 236 m² built, 170 m² living area, 2200 m² plot sq.meters, 4 bedrooms, 1 bathrooms, 2 garage/s, good condition, outward, 1 cupboards, 1 terraces, kitchen equipped, storage room, courtyard, orientation south, more than 30 years, , 2 floors, heating individual, fuel gasoil, hot water individual, water energy gasoil, utilities connected, floor stoneware

Features
Property
  • 236 m2 built
  • 170 m2 living area
  • 2200 m2 plot sq.meters
  • 4 bedrooms
  • 1 bathrooms
  • Good condition
  • Outward
  • 1 cupboards
  • 1 terraces
  • Kitchen equipped
  • Orientation south
  • More than 30 years
  • Floor stoneware
Building
  • 2 floors
  • Garden
Additional features
  • 2 garages/s
  • Storage room
  • Courtyard
  • Heating individual
  • Fuel gasoil
  • Hot water individual
  • Water energy gasoil
  • Utilities connected
  • IBI: 120€
Energy certificate
energy certificate
195.4
50.2
Mortgage simulator
Listing price
Taxes and expenses
Price + expenses
0 €
Savings provided
Term in years
interest
Your monthly fee
0
These results are indicative, calculated with the numbers you have entered.
Map
Other properties that could be of interest to you

Inmobiliaria Casa Nueva, Pisos Asturias y Casas Asturias

This website uses cookies

A computer cookie is a small information file that is saved in your browser every time you visit our website.

Our website uses, among others, technical cookies that are essential for the page to function. We have them activated by default, as they do not need your authorization.

More information in our section COOKIES POLICY.